The public record behind each market's land basis, exit and permit time, with a source for each figure.

68 land, new-build and resale records across the six allocated towns and the three monitored ones. Items marked unverified could not be confirmed from the source page; every land comp is to be confirmed against MLS records before close.

Market signals

Windows and sources as cited
  • $5M+ closings, Q3 2026
    San Mateo, Santa Clara and Alameda counties; $20M+ tier 9 closings at a median 31 days and 92.4% of ask
    232, up 32.6%
  • Sales over $10M, Jan 1–Oct 23, 2026
    SF, San Mateo and Santa Clara; Atherton 41, SF 30, Hillsborough 20, Palo Alto 17, Los Altos Hills 11; 44.2% sold below ask
    156 ($2.53B)
  • Teardown land, median per lot sf
    Q2 2026; Atherton, Woodside, Hillsborough and Los Altos Hills had too few sales for a published median
    Palo Alto $502 · Menlo Park $434
  • SB 9 lot splits
    An urban lot split requires a 3-year owner-occupancy affidavit, which a fund cannot sign (Gov. Code 66411.7)
    Not used
  • Atherton 94027 median sale
    Closed sales Jan 1–Sep 30, 2026; first eight-figure U.S. ZIP median in this ranking
    $10,725,000
  • Year-over-year change
    Same PropertyShark ranking; ninth #1 finish in 11 years
    +29% from $8.3M
  • Gap to #2 ZIP
    Same ranking
    About $3.4M above Sagaponack, N.Y. at $7.35M
  • Atherton new-build exit band used here
    About the last 18 months; 8,400–12,854 sf houses
    $2,234–$2,956/sf
  • Atherton teardown land band used here
    About the last 12 months; two confirmed sales with both price and lot size
    Source: 123 Stockbridge, 57 Fairview
    $9.5–10.7M, or $188–$258 per land sf
  • Old Palo Alto land print
    July 20, 2026 MLS close; 31,744 sf lot
    $21,775,000, or about $686/sf of land

Comps by market

New builds first, then pending sales, resales and land. A dot marks the sales whose median sets each market's exit.
Exit used
$2,487/sf · median of 5
Land basis
$10.10M
Permit
6–12 months (builder guide); the model uses 12
Transfer tax
0.11%: the city tax is credited against the county tax (AMC 3.12.020)

$2,487/sf, the median of five in-window new-build sales ($2,234–$2,956/sf). $10.1M, the midpoint of two teardown sales ($9.5M at 123 Stockbridge, $10.7M at 57 Fairview) on about an acre.

TypeAddressDatePriceSize$/sfNotesSource
New build●178 Atherton AveAug 26, 2026$38.00M12,854 sf$2,956Listed by Jen Finato at $39.95M; 30 DOM.Sources:jhagents.com,therealdeal.com
New build●97 Santiago AveNov 5, 2026$26.20M10,595 sf$2,473West Atherton, Circus Club. Listed late June at $27.8M.Source:realtywire.com
New build●98 Flood Circle (Villa Zeeba)Jun 10, 2026$22.00M8,400 sf$2,61929 DOM (Movoto).Unverified: No public URL on file; confirm against MLSNo public URL; confirm against MLS
New build●167 Almendral AveJun 23, 2026$21.90M8,805 sf$2,487Listed Mar 2 at $24.5M.Unverified: No public URL on file; confirm against MLSNo public URL; confirm against MLS
New build●269 Stockbridge AveOct 27, 2025$19.60M8,773 sf$2,234Listed May 5 at $21M.Unverified: Basis unverified; no public URL on fileNo public URL; confirm against MLS
New build94 Melanie Lane (The Opus)Apr 28, 2025$32.10M12,840 sf$2,500About two weeks before the 18-month window that starts May 15, 2025 — included for context.Unverified: Outside 18-month windowSource:therealdeal.com
Land123 Stockbridge AveNov 12, 2025$9.50M50,400 sf lot1.16 ac$188per lot sfLow end of the $9.5–10.7M Atherton land band.Source:houseberry.com
Land57 Fairview AveNov 13, 2025$10.70M41,464 sf lot0.95 ac$258per lot sfHigh end of the $9.5–10.7M Atherton land band.Source:houseberry.com

● In the median that sets the modeled exit of $2,487/sf. Unmarked new builds fall outside the 18-month window or lack a verified size.

Atherton and Palo Alto comps explorerAll 13 Atherton and Palo Alto records, charted over time or ranked, with builder, basis and notes
closed sales in view
10
aggregate $/sf (Σ price ÷ Σ sf)
$2,516
Range
$1,556–$3,307/sf
Closed sales · showing 6 of 10
  • 97 Santiago Ave
    West Atherton, Circus ClubNew build
    $2,473
    Closed
    Nov 5, 2026
    Price
    $26.20M
    House sf
    10,595
    Model: Cross-check preset ($2,473/sf)
    Source:realtywire.com
  • 1418 Pitman Ave
    Crescent ParkNew build
    $3,307
    Closed
    Week ending Nov 8, 2026
    Price
    $14.08M
    House sf
    4,257
    Model: OPA high-print preset ($3,307/sf)
    Source:realtywire.com
  • 178 Atherton Ave
    AthertonNew build
    $2,956
    Closed
    Aug 26, 2026
    Price
    $38.00M
    House sf
    12,854
    Model: Optimistic exit ($2,956/sf)
    Sources:jhagents.com,therealdeal.com
  • 167 Almendral Ave
    AthertonNew build
    $2,487
    Closed
    Jun 23, 2026
    Price
    $21.90M
    House sf
    8,805
    Source: Listing syndication
  • 98 Flood Circle (Villa Zeeba)
    AthertonNew build
    $2,619
    Closed
    Jun 10, 2026
    Price
    $22.00M
    House sf
    8,400
    Source: Movoto / listing syndication
  • 90 Crescent Dr
    Crescent ParkNew build
    $1,556
    Closed
    May 4, 2026
    Price
    $8.11M
    House sf
    5,213
    Source: Compass / listing syndication

Comp quality. Atherton exits are new houses of 8,400–12,854 published sf on 0.83–1.04 acre lots. On every one, the published sf is larger than the above-grade floor-area limit for its lot under Atherton Municipal Code 17.32.040 (6,619–8,149 sf), so the published figure includes area excluded from floor area, most likely a basement. The model therefore prices its 7,500 sf above grade plus 3,500 sf basement on the same total-sf basis. Palo Alto exits are smaller houses (2,900–5,213 sf) and are not like-for-like with a 6,000 + 3,500 sf program on 31,744 sf. Use the calculator's “above-grade only” toggle to price either town on above-grade area alone.

Atherton new-build comps are from about the last 18 months (about May 15, 2025–Nov 15, 2026) unless flagged. Land comps are from about the last 12 months (Nov 15, 2025–Nov 15, 2026); only sales with both a close price and a lot size are used. Palo Alto exits are 2026 new-construction sales from a single search and are not an exhaustive list. Listings are not used as closed sales. $/sf is sale price divided by published house sf.

Land-to-exit spread is exit minus the prior land or house purchase, not net profit. No in-window land sales with both price and lot size were found for Crescent Park, Professorville, Community Center, the Menlo Park pockets screened, Los Altos Hills, Woodside or Hillsborough. The Circus Club 2.5 acres at $25.5M was a listing, not a sale, and is excluded. Comps marked with a source label but no link are cited from listing syndication or a report without a public URL.

Zoning & permits by market

The modeled house in each town sits inside these limits. Permit times are the long end of each published range; where a town publishes none, the figure is an assumption.
MarketZoning and floor areaPermitTransfer taxSources
Atherton
  • Floor area: 18% of the lot; floor area above the first floor 7.5% of the lot (AMC 17.32.040)
  • Basement: Excluded when the first floor is under 2 ft above grade; up to 100% of the first floor (AMC 17.44.030, 17.44.040)
  • Minimum lot: 1 acre in R-1A (builder guide)
  • Modeled house: 7,500 sf above grade + 3,500 sf basement: inside the 7,841 sf floor-area and 3,267 sf upper-floor limits for a one-acre lot
6–12 months (builder guide); the model uses 120.11%: the city tax is credited against the county tax (AMC 3.12.020)Sources:atherton.municipal.codes,atherton.municipal.codes,atherton.municipal.codes,mkbayarea.com
Los Altos Hills
  • Floor area: MFA and maximum development area by a slope-adjusted lot unit factor; listing worksheets show about 5,000–7,164 sf on 1.03–1.26 acres
  • Basement: Exempt from MFA when it qualifies (at least 75% of the perimeter underground, among other tests)
  • Height: 27 ft
  • Review: Site Development permit, at staff or Planning Commission
  • Modeled house: 6,000 sf above grade + 3,000 sf qualifying basement: under the lot's 6,180 sf MFA, with the basement exempt
13–17 weeks from Site Development submittal to permit (Town); the model uses 6 months, adding 2 months to prepare the submittal0.11% county rate assumed; a city transfer tax was not checkedSources:losaltoshills.ca.gov,losaltoshills.ca.gov,losaltoshills.ca.gov
Hillsborough
  • Floor area: 25% of net lot area for the first acre plus 15% over one acre; garages count
  • Basement: Counts at 33% when walls are under 2 ft above grade; 100% when 2 ft or more
  • Review: Architecture and Design Review Board; City Council decides houses of 8,000 sf or more
  • Height: 32 ft within setback lines, plus a building envelope
  • Modeled house: 5,000 sf above grade, garage included, + 2,900 sf basement counted at 33%: 5,957 sf against a 6,763 sf limit, and under 8,000 sf in total
12–18 months with 2–3 design revision cycles (builder guide); the model uses 180.11% county rate assumed; a city transfer tax was not checkedSources:hillsborough.net,library.municode.com,mkbayarea.com
Palo Alto
  • Floor area: 0.45 on the first 5,000 sf of lot plus 0.30 above; 6,000 sf house cap (PAMC 18.12)
  • Basement: Excluded when the first floor is no more than 3 ft above grade; not beyond the footprint; not in flood zones (PAMC 18.12.090)
  • Height: 30 ft (33 ft at a 12:12 pitch)
  • Review: Objective design standards, or discretionary Individual Review
  • Modeled house: 3,750 sf above grade (the FAR limit on 10,000 sf) + 2,500 sf basement excluded from floor area
Not published by the city; the model assumes 14 months of permit and design0.44%: county $0.55 plus city $1.65 per $500 (PAMC 2.34.020)Source:codelibrary.amlegal.com
Woodside
  • Floor area: Total floor area 18% of the lot in SR, 9% in RR, 2.75–5.5% in SCP
  • House cap: Main residence 4,000 sf in SR (5,500 with an exception); 6,000 sf in RR and SCP (8,800 with an exception)
  • Basement: Areas below exterior grade do not count
  • Height and review: 30 ft in SR, RR and SCP; Architectural and Site Review Board
  • Modeled house: 5,000 sf main house, under the 6,000 sf RR cap without an exception and the 9% floor-area limit, + 3,000 sf below grade, which does not count
9–15 months (builder guide); the model uses 15 and a 4-month sale for the thinner buyer pool0.11% county rate assumed; a city transfer tax was not checkedSources:gocodebook.com,gocodebook.com,mkbayarea.com
Menlo Park
  • Floor area: 2,800 sf plus 25% of lot area over 7,000 sf: about 3,550 sf on 10,000 sf, 3,725 sf on 10,700 sf (MPMC 16.14)
  • Basement: Excluded only when the main floor is no more than 30 in. above grade (MPMC 16.04)
  • Height: 28 ft on lots under 20,000 sf
  • Review: Staff or Planning Commission review for new two-story houses
  • Modeled house: 3,725 sf above grade (the floor-area limit on 10,700 sf) + 2,000 sf basement with the main floor no more than 30 in. above grade
4–12 months from complete submittal, plus 1–5 months of design review (builder guide); the model uses 170.11% county rate assumed; a city transfer tax was not checkedSources:ecode360.com,ecode360.com,supplehomesinc.com
Atherton and Palo Alto rules in detailEach rule with its effect on the model and its source
  • Floor area limit

    In the R-1A district, the floor area of all main and accessory buildings may not exceed 18% of the lot (on lots under one acre, 0.163 × lot area + 726 sf). Above-grade garages count. Rooms with an open height of 16 ft or more count twice.

    Effect: 7,841 sf on a one-acre (43,560 sf) lot. The base case models 7,500 sf above grade. The low-comp case models 7,400 sf, to fit the 7,485 sf limit on 57 Fairview's 41,464 sf lot.

    Sources:atherton.municipal.codes,atherton.municipal.codes
  • Upper-floor limit

    Floor area above the first floor may not exceed 7.5% of the lot.

    Effect: 3,267 sf on one acre. The 7,500 sf base house is planned as about 4,300 sf on the first floor and 3,200 sf above.

    Source:atherton.municipal.codes
  • Basements

    A basement under the main building may be up to 100% of the first-floor area, within its footprint (minor extensions up to 140 sf at staff level; up to 120% with a special structures permit, with at least 75% under the footprint). Garages may be placed in a basement. A basement is excluded from floor area when the first finished floor is less than 2 ft above average natural grade.

    Effect: The 3,500 sf finished basement fits under a 4,300 sf first floor without a special structures permit, and does not count toward the 7,841 sf limit. The remaining basement allowance can hold the garage, which is not costed separately.

    Sources:atherton.municipal.codes,atherton.municipal.codes
  • Program and pricing basis

    Closed Atherton new builds in the comp set are 8,400–12,854 published sf on 0.83–1.04 acre lots. Each is larger than its lot's above-grade limit (6,619–8,149 sf), so published sf includes area excluded from floor area — at least 7% to 39% of the total.

    Effect: The base case prices 11,000 sf in total (7,500 above grade plus 3,500 basement, 32% below grade) at the comps' $/sf, on the same total-sf basis the comps report. Basement area is built at the same $/sf as the house.

    Sources:jhagents.com,realtywire.com,atherton.municipal.codes
  • Permit time

    Assumption

    Atherton does not publish a typical total permit cycle for a new house.

    Effect: The model assumes 12 months of permit and design, then 18 months to build and 3 months to sell.

    Source: Assumption
  • Transfer tax

    City tax of $0.275 per $500, credited against the county's $0.55 per $500 under R&T 11911(c), so the combined rate is $1.10 per $1,000 (0.11%).

    Effect: About $31,400 on a $28.55M Atherton base-case sale — small relative to profit.

    Source:atherton.municipal.codes
Transfer tax in the model: Atherton / San Mateo County — 0.11% ($1.10 per $1,000). California R&T 11911 is $0.55 per $500. Atherton Municipal Code 3.12.020 sets a city half-rate that is credited against the county tax under R&T 11911(c), so the combined documentary transfer tax stays $1.10 per $1,000.Source:atherton.municipal.codes

Draft · November 16, 2026

Important Disclosures

Draft notice

These disclosures are a working draft prepared for discussion. They have not been reviewed by securities counsel and must be reviewed and approved by securities counsel before these materials are distributed to any prospective investor.

Not an offer

This website and any related materials (the “Materials”) concerning JI8 Bay Area Estates Fund I (the “Fund”), a proposed fund sponsored by JI8 LLC (“JI8 Capital” or the “Sponsor”), are provided for information and discussion purposes only. The Fund has not been formed and has raised no capital. The Materials do not constitute an offer to sell, or a solicitation of an offer to buy, any security, interest in any fund or other investment, and may not be relied on in connection with any investment decision. Any such offer or solicitation will be made only by means of a confidential private placement memorandum, the Fund’s governing documents and subscription documents (the “Offering Documents”), which will contain material information not contained here and will supersede the Materials in their entirety.

Accredited investors and qualified clients only

The Materials are intended only for persons who are both “accredited investors” as defined in Rule 501(a) of Regulation D under the U.S. Securities Act of 1933, as amended (the “Securities Act”), and “qualified clients” as defined in Rule 205-3 under the Investment Advisers Act of 1940. Any offering is expected to rely on Rule 506(b) of Regulation D, with a minimum investment of $100,000, which the Sponsor may waive. Interests have not been registered under the Securities Act or any state securities law, and have not been approved or disapproved by the SEC or any state regulator.

Forward-looking statements

The Materials contain forward-looking statements, including targets, projections, models, estimates and statements about strategy, land sourcing, costs, permit timing, financing and market conditions, identified by words such as “target,” “expect,” “model,” “would,” “may” and similar terms. They are based on the Sponsor’s current assumptions and beliefs, which may prove incorrect, and are subject to risks and uncertainties that could cause actual results to differ materially. The Sponsor undertakes no obligation to update them.

Target and hypothetical returns

The target gross fund IRR of 24.5% and gross multiple of 1.7x, Class A’s 11% target preferred return (before management fee), Class B’s modeled net IRR of 21.8% (1.85x), and all other modeled returns are hypothetical performance from the Sponsor’s model of land, construction, financing, timing and sale-price assumptions across six markets. Gross figures are after project costs and financing, before fund costs and performance allocation. Net figures are after an advisory fee of 1.50% a year of invested capital, paid quarterly in arrears (the only advisory fee, called the management fee for Class A; no step-down); operating expenses of 0.5% of commitments a year, capped at 1.50% a year of year-end gross asset value; and a performance allocation from Class B only of 30% after a 7% non-compounded preferred return and a 100% catch-up. Class A receives an 11% preferred return ahead of the return of capital and no profit share. Commitments are assumed split 50% Class A and 50% Class B; another mix changes the results. These are proposed terms that have not been documented. Net figures exclude investor-level taxes; the model charges no Sponsor developer fee or construction markup, which would reduce returns. The proposed term is 5 years from the end of the investment period (24 months after the final close) plus two 1-year extensions; with a final close assumed in month 24, the modeled hold of about 82 months ends inside the term. The figures do not reflect actual investment. Hypothetical performance has inherent limitations, including the benefit of hindsight in selecting assumptions. Targets are not guarantees, projections or predictions of future results, and the Fund may not achieve them. The Fund has no track record.

Past performance

Past performance, including the comparable sales of homes built by others that are cited in the Materials, is not indicative of future results. No information in the Materials represents the past performance of JI8 Capital or the Fund.

Illustrative markets and comps

The market allocations shown (Atherton 30%, Los Altos Hills 20%, Hillsborough 15%, Palo Alto 12%, Woodside 10% and Menlo Park 8%, with a 5% reserve for an opportunistic deal in Saratoga or San Francisco) and the land and new-construction comparables are illustrative. They describe how the Sponsor would underwrite, not properties the Fund will buy. No property is under contract or controlled by the Fund or the Sponsor. Land comparables come from listing and press reports and must be confirmed against MLS records before any purchase; figures marked unverified could not be confirmed from their source. Listings may sell, change price or be withdrawn at any time, and there is no assurance that the Fund will acquire any property in these markets, or at the prices modeled.

Third-party data

Market, listing, sales, zoning and lending data come from third parties, including the municipal codes and the planning and building departments of Atherton, Los Altos Hills, Hillsborough, Palo Alto, Woodside, Menlo Park and San Francisco; the Santa Clara County Clerk-Recorder; the California Legislature; MLSListings and MLS-sourced listing and brokerage sites such as Redfin, Realtor.com, Compass and Coldwell Banker; brokerage market reports; PropertyShark; The Real Deal; local press such as Palo Alto Online and The Almanac; builder and architect cost and permit guides; and published lender program pages, as of the dates shown (generally November 15, 2026; regional sales counts cover January 1 to October 23, 2026). The Sponsor believes these sources are reliable but has not independently verified them and makes no representation as to their accuracy or completeness. No lender, appraiser, broker or public official has reviewed the figures, and no lender has issued a term sheet.

Risk of loss

An investment in the Fund would be speculative, involve a high degree of risk and be suitable only for investors who can bear the loss of their entire investment. Risks include loss of capital; illiquidity and restrictions on transfer; leverage, including construction loans modeled at 65% loan-to-cost (capped at 70% of completed value) and land advances of up to 50% of land value; construction cost overruns and delays; entitlement, design review and permitting; market and exit-price risk, including limited sales data at the price points modeled; interest-rate and financing risk; concentration in Bay Area single-family real estate, principally in San Mateo and Santa Clara Counties, and natural hazards including earthquake and wildfire; key-person risk; and conflicts of interest, including the Sponsor’s development team managing construction on the Fund’s homes. See the risks and mitigants in the Materials and, when available, the Offering Documents.

Confidentiality

The Materials are confidential and are intended only for persons to whom they have been made available by JI8 Capital. They may not be reproduced or disclosed, in whole or in part, without the prior written consent of JI8 Capital. By accessing the Materials, the recipient agrees to these restrictions.

No tax, legal or investment advice

Nothing in the Materials is tax, legal, accounting or investment advice. Prospective investors should consult their own advisors about the legal, tax and financial consequences of any investment.

Illustrative imagery

The architectural images on this website are computer-generated illustrative renderings created for presentation purposes only, and the Bay Area map is a stylized illustration, not to survey scale. They do not depict a property owned, controlled, developed or built by the Fund, the Sponsor or any affiliate, nor any property cited as a comparable, and are not a representation of any home the Fund may develop.

Date and version

Information is as of November 16, 2026 unless otherwise stated, and is subject to change without notice; market data is generally as of November 15, 2026. Draft version dated November 16, 2026. These disclosures are a working draft and are subject to review by securities counsel.

How the figures are built is set out in the method notes; each risk, with its exposure and mitigant, is in Risks & mitigants.